Projects

Our Commissioning Projects

With our unwavering dedication and proactive approach, we guarantee that your building will be finished to the highest standards and that all protocols and procedures will be meticulously adhered to. Take a look at our gallery to witness our vast expertise in providing commissioning services.

Current Projects


Haringey Civic Centre

London

Client: SISK
Type of Contract: Commissioning Management
Project Duration: December 2025 – Present

Buckingham Palace South Wing

London

Client: JA Brooks
Type of Contract: Commissioning Management
Project Duration: November 2025 – Present

Winnersh building 1180

Reading

Client: KJ Tait
Type of Contract: Validation & TAB Commissioning
Project Duration: November 2025 – Present

Magdalen Street

Oxford

Client: KJ Tait
Type of Contract: Commissioning Management/Validation
Project Duration: October 2025 – Present

Oval Building, Block B

Vauxhall

Client: Malcolm Building Services
Type of Contract: TAB Commissioning
Project Duration: August 2025 – Present

LD5, Data centre

Slough

Client: Straightline Consulting
Type of Contract: Commissioning Management/Validation
Project Duration: April 2025 – Present

100 NBS

Blackfriars, London

Client: SES Engineering Services Ltd
Type of Contract: Commissioning Management, Water treatment, TAB Commissioning
Project Duration: January 2025 – Present

Millennium Building

Wimbledon, London

Client: SES Engineering Services Ltd
Type of Contract: M&E Validation Services, remedial water treatment and Commissioning Strategy reviews
Project Duration: July 2024 – Present

Victoria House

Bloomsbury, London

Client: SES Engineering Services Ltd
Type of Contract: Commissioning Management, Water Treatment, TAB Commissioning
Project Duration: September 2023 – Present

Byng Street Friary Park Water Meadow Court
St John’s Hill

London

Client: Mount Anvil
Type of Contract: Commissioning Management Project Duration: June 2021 – Present

Prime Environmental Services have been appointed by Mount Anvil to provide District Heating Network Consultancy.  As with many residential developments, phased handovers can become troublesome if not accurately planned, our attention to detail for the systems in their entirety has assisted with the smooth handover of many of the blocks via temporary plant or integration to existing services. Our robust witnessing presence has ensured the correct processes have been carried out for each associated services to their relevant standards and guidance’s. This bespoke scope of works has been very well received by our client for all elements of; pre commission cleaning, commissioning, BMS control, metering and phased integration. 

Past Projects


CWL90

Newport, Wales

Client: JA Brooks
Type of Contract: Commissioning management
Project Duration: February 2025 – August 2025

Commissioning management on behalf of M&E contractor.

One Hotel

Nine Elms, London

Client: Designer Group
Type of Contract: Hands on TAB Commissioning
Project Duration: September 2023 – November 2024

Maidstone Barn Theatres

Maidstone Hospital

Client: SES Engineering Services Ltd
Type of Contract: Commissioning Management, Water Treatment, TAB Commissioning
Project Duration: August 2023 – September 2025

Excel Phase 3

London

Client: SES Engineering Services Ltd
Type of Contract: Commissioning Management
Project Duration: June 2023 – July 2024

The Stage

Euston, London

Client: Kane Group
Type of Contact: Commissioning management
Project Duration: March 2025 – May 2025

Commissioning Management provided for the CAT B fit out works.

Springfield University Hospital

Tooting, South London

Client: SES Engineering Services Ltd
Type of Contract: Hands on Ventilation/Water Commissioning

Project Duration: December 2022 – September 2023

Hardwick House

Euston, London

Client: ASM Engineering
Type of Contact: Hands on Ventilation Commissioning
Project Duration: March – April 2023

Prime Environmental Services have been appointed by ASM Engineering to provide hands on ventilation commissioning of their Hardwick House scheme. This project comprises of HRUs, EF, SF and AC units.

JJ Mack Building

33 Charterhouse Street, London

Client: SES Engineering Services Ltd
Type of Contract: Commissioning Management & Hands on Ventilation/Water Commissioning

Project Duration: December 2021 – October 2022

Cleveland Clinic

33 Grosvenor Place, London

Client: SES Engineering Services Ltd
Type of Contract: Commissioning Management 
Project Duration: March 2020 – January 2022

The Cleveland Clinic project is a new build located in Grosvenor Place, London that provides premium private healthcare for the area. SES Completed the mechanical, public health and building management systems as contracted.

Prime were appointed to provide commissioning management for the SES project team providing key skills such as; programme updates, troubleshooting expertise, progress tracking, thorough documentation and RAMS reviews, meeting attendance, pre-client witnessing and general quality assurance checks. 

Key mechanical services on the project are; 

  • LTHW & Steam Boilers
  • Chillers 
  • DX systems 
  • Domestic Water Services and RO plant 
  • 36 Air Handling Units
  • Smoke Extract 
  • Advanced air system compromising of 900+ MSFDs 
  • BMS 

Royal London Hospital

Whitechapel, London

Client: SES Engineering Services Ltd
Type of Contract: Commissioning Management 
Project Duration: March – April 2020

Prime were appointed by SES Engineering Services to carry out the Commissioning Management of Royal London Hospital, a 2 floor M&E fit out for potential COVID-19 patients. The project had a 5 week turnaround due to the circumstances and was completed, on time, to a very high standard conforming to HTM compliances. Prime had 3 operatives based at the project working a mixture of days and nights, 7 days a week to ensure the commissioning process was correctly sequenced and managed.  An ‘all hands on deck’ approach was the attitude adopted by everyone involved and it was a valiant effort to get the project handed over on time. Prime’s involvement on the project was from start to finish, assisting with commissioning and water treatment methodology (which had to be carefully managed so not to effect live hospital wards across other floors), RAMS review, assisting the teams on site with any issues encountered, daily commissioning meetings were held to discuss progress and plan the commissioning activities.

Prime were also tasked with witnessing all elements of electrical and mechanical commissioning and creating the index and sign off sheets for all commissioning documentation which fed directly into the O&Ms. Prime were the point of contact for the Trust’s representatives who were based on site and tasked to validate and sign off the building services on behalf of the NHS. This partnership was fluid with both parties adopting the same positive attitude to not hinder the project but have the best possible standard of works completed.    

https://www.youtube.com/watch?v=0HLAoLRqA_k

M&E Services on the project as follows;

Bart’s Square Phases 1 & 3

London EC1

Client: SES Engineering Services Ltd / McLaren / Carillion 
Architect: Sheppard Robson
Type of Contract: Commissioning Management
M&E Consultants: SWECO
Project Duration: March 2016 – March 2020

Prime ES were appointed as Commissioning Managers to Main Contractor at Phase 1 and SES Engineering Services for Phase 3 of this prestigious development. 

Bart’s Square is a residential development within the City of London consisting of 235 (Ph1-144 & Ph3-91) luxury apartments plus retail space and landlords shell & core infrastructure. A resident’s amenity area is included with a screening room for 20 people, a bar/lounge and a private dining/meeting room. There is provision for car parking and bicycle storage at lower ground level.

Phase 1 & 3 is provided with District Heating & Cooling to 6x Plate Heat Exchangers which is circulated to each apartment via HIUs & CIUs within individual MEP cupboards. This process was carefully managed to ensure both the client and energy provider were satisfied with the end product to obtain a seemless handover and adoption. 

A total of 11 blocks and 2 basements were individually handed over to the client and full systems C&E / IST carried out for each buildings Practical Completion. Both Mechanical and Electrical services were integrated from Phase 1 – 3, Prime playing a key role in these activities to ensure tennanted apartments were kept to minimal disruption.

Key M&E Services for the project; 

  • Full KNX home automation
  • Titan Heating and Cooling controls 
  • District Heating & Cooling 
  • 2 x life saftey generator and PLC system
  • ATS  
  • Fire Alarm 
  • Sprinkler systems
  • Building security
  • TV & Data  
  • COLT and Advanced Air smoke ventilation systems
  • Lighting control & Emergency lighting 
  • BMS

Colt, Les Ulis Data Centre

Paris

Telehouse TN2 Data Centre Canary Wharf

London

Client: Mace
Type of Contract: Commissioning Management
MEP Consultant: Cundall
Date Commenced: September 2016

Prime ES were appointed by main contractor Mace in September 2016 as Commissioning Management support to their Canary Wharf TN2 Data Centre project.

Telehouse North is an advanced colocation data centre.

  • Awarded BREEAM Excellent standard
  • The world’s first multi storey adiabatic cooling system
  • 8 x Generators with N +1 redundancy with a total capacity of 18.5MW

Telecity 6-7 Harbour Exchange

London Docklands

iO Modular Data Centre

Slough

Client: iO
Type of Contract: Commissioning Management
Project Duration: November 2014 – July 2015

In November 2014 Prime were appointed Commissioning Managers to North American Data Centre specialist IO for their new Slough-based facility. Following successful completion and handover of Phase 1, Prime were retained to manage the commisioning of further expansion at the facility

The Data Centre uses the first international deployment of BASELAYER’s advanced ECO modules using outside air cooling, backed by traditional chilled water technology.

This 10,405 sq m colocation site is provided with 20 MVA of core power infrastructure (Phase1). Power backup is via 2.5MVA Caterpillar diesel generators (Up to 7 Units) + Modular UPS deployment in 1.3 MVA increments.

IO runs five other facilities worldwide including, Singapore, Phoenix, Scottsdale, Ohio and New Jersey. This is their second modular Data Centre outside of North America, following
Singapore in 2013.

AWE Project Phoenix

Berkshire

South Hampstead High
School

London

Client: Essex Services Group (ESG)
Type of Contract: Commissioning Management

  • Value: £14 million New build contemporary designed school including a new sports hall
  • Designed and Commissioned to achieve a BREEAM ‘Excellent’ rating
  • Mechanical and electrical packages include CHP plant, chillers, and fan coil units as well as AHU’s, mains water distribution, sprinklers, BMS, electrical distribution, small power, PV Solar, interior and exterior lighting

Royal London Hospital

Whitechapel, London

Data City Exchange

Birmingham

Client: Aggmore
Type of Contract: Commissioning Management
M&E Consultants: PAE Consultants (Concept design)
Contract Duration: December 2012 – August 2013

Data City Exchange Birmingham Campus provides 110,000 square feet of high security, modular data centre space based on its own Evo-POD data centre design.

Design features:

  • Modular Data Centre Space offering 8 x 400 – 1200kW 96 Rack Modular Build Evo-PODs
  • EVO-PODs designed to the Uptime Institutes Tier 3 standard and ASHRAE 2011 Thermal Guidelines for Data Processing Environments Class A1
  • Low PUE (Power Usage Efficiency) value

Commissioning Management of M&E Services including:

  • Chilled/condenser water system inc. 80,000 litres buffer vessel integrated within the chilled water system
  • Chilled Water system, utilising cooling towers to benefit from free cooling
  • Fully integrated BMS system interfacing with EMS, fire alarm and all services infrastructure equipment
  • Energy Monitoring System (EMS)
  • Switchgear supplies A & B to critical parts of the system
  • PLC Controlled Generator Back-up
  • 2 x 500kVA Static UPS Systems
  • P1 fire alarm system ucombined with VESDA smoke aspiration systems

View Road

Highgate, London

Oracle Apartments

Hampstead, London

London Evening Standard Homes & Property, New Homes award winner

Client: Harrison Varma
Type of Contract: Commissioning Management
M&E Consultants: Hoare Lea
Contract Duration: April – October 2012

The Oracle Apartments consist of seven high-end residential homes with secure underground parking situated on prestigious West Heath Road Hampstead. Prime were appointed Commissioning Managers on behalf of the developer Harrison Varma. 

Design features:

  • Concealed comfort cooling and heating VRF system with MVHR
  • All occupied areas fitted with electric under floor warming, including wet areas i.e. bathrooms / toilets
  • All hot water provided via LTHW heat exchangers served from CHP Unit and supplemented with centralised Boiler plant
  • Centralised BMS Controls
  • Rainwater Harvesting & Automated Garden Irrigation
  • Two dedicated 8 person lifts
  • Secure, gated access control system with integrated video entry for pedestrian visitors
  • Infrared CCTV monitoring systems with TV interface
  • Wireless building wide integrated fire alarm system

RAF Wyton

MOD Secure Data Processing Facility, Cambridgeshire

South Place Hotel

London

Client: McLaren Construction Ltd
Type of Contract: Verification Engineers
M&E Consultants: Hoare Lea
Contract Completion: October 2012

South Place Hotel is a new boutique hotel constructed at 3 – 4 South Place in the City of London. The building is 10 storeys with 5 floors of hotel rooms with 80 guest rooms in total. Front of house areas comprise entrance foyer, brassiere, bars, function rooms, sauna, steam room, gym and restaurants. Support facilities and plant are provided in the basement with further plant at roof level. Kitchens in the basement, ground, first and seventh floors.

Commissioned to BREEAM Excellent rating

Four Seasons Hotel

Park Lane, London

Regents Place

London

Client: British Land PLC
Type of Contract: Commissioning Management
M&E Consultants: Watkins Payne
Contract Completion: 2009

This £195m commercial mixed use development is comprised of two commercial office buildings (366,000 ft² grade A office space) sited at the new Triton Street, a residential building on Osnaburgh Street comprised of 154 apartments within a twenty storey tower,  a community theatre (New Diorama Arts Centre) and  7,940 ft² of A3 retail space.

Our commissioning management services throughout the construction phase ensured a successful completion of the project*

Completed in 2009 the development achieved BREEAM Excellent environmental ratings

  • Residential excellent Ecohomes rating
  • Offices excellent BREEAM rating
  • Photovoltaic cells
  • CHP
  • Rainwater harvesting
  • Solar thermal panels
  • Green roof

*Regent Place Commissioning Managemet by Prime staff on behalf of Commtech Group

Get in touch with Prime Environmental Services Ltd now to start your commissioning management project – call or email us today!